05 HVAC _ CDIM COBERTURA rev02-Layout1

1 Pages • 333 Words • PDF • 949.4 KB
Uploaded at 2021-09-24 14:28

This document was submitted by our user and they confirm that they have the consent to share it. Assuming that you are writer or own the copyright of this document, report to us by using this DMCA report button.


4

2

LAJE IMPERM.

LAJE IMPERM.

EX-3P-02

10%

A

10%

10%

EX-3P-04

EX-2P-01 CALHA

EX-2P-02

AP

(1200)

EX-2P-06

(1200)

(1200)

EX-3P-05

(1200)

10%

EX-3P-06

EX-2P-04

(1200)

LAJE IMPERM.

10%

(3600)

EX-3P-01

(3600)

LAJE IMPERM.

LAJE IMPERM.

(1200)

LAJE IMPERM.

EX-3P-07 (1200)

EX-TR-05

(1200)

EX-2P-03

EX-1P-01

AP

AP

(1200)

(1200)

EX-1P-02

CALHA

(1200)

EX-2P-05

AP

(1200)

EX-TR-04 (1200)

(3600)

N PLATIBANDA H = 25 RUFO / CONTRA-RUFO AP

AP PROJ. SHAFT

10%

EX-3P-03 (3600)

B

TAMPA DE CONCRETO

TAMPA DE CONCRETO

LAJE IMPERM.

1

EX-TR-01

EX-TR-03

(3600)

(1200)

EX-TR-02 (3600)

TELHA DE FIBROCIMENTO ONDULADA 8mm

11,6%

LAJE IMPERM.

LAJE IMPERM.

2%

IMP1 LAJE IMPERM.

TELHA DE FIBROCIMENTO ONDULADA 8mm

11,6%

6

RUFO / CONTRA-RUFO

1

TAMPA DE CONCRETO

TELHA DE FIBROCIMENTO ONDULADA 8mm

RUFO / CONTRA-RUFO

RUFO / CONTRA-RUFO

TELHA DE FIBROCIMENTO ONDULADA 8mm

RUFO / CONTRA-RUFO

10%

6

LAJE IMPERM.

PROJ. SHAFT RALO

LAJE IMPERM.

LAJE IMPERM.

AP RUFO / CONTRA-RUFO

RUFO / CONTRA-RUFO

IMP1 LAJE IMPERM. AP

AP

CALHA

C

CALHA

10% 3

3

D

(telha superior, poliuretano e telha

CDIM - PLANTA DE COBERTURA ESCALA 1:75

2

4

CABLAGEM

ALVENARIA

INFERIOR DO FORRO OU LAJE

VER

TERRA 1x #1,5mm2

VER

CAIXA DE

GABINETE DA UNIDADE EVAPORADORA

FACE ACABADA DA PAREDE

CAIXA DE

ACABAMENTO DA PAREDE

LEGENDA: (VAI PARA O PONTO DE

TAG DO EQUIPAMENTO ESC.: 1:2

ESC.: 1:2

GR1 1500

Tubo de cobre Fita protetora

Tubo de PVC

1. CONFERIR MEDIDAS NA OBRA.

Tubo de cobre

3 Metros

GABINETE DA UNIDADE EVAPORADORA

INFERIOR DO FORRO OU LAJE

1.1 .

S/ESC.

Tubo de cobre Fita protetora

BRAULIO CAROLLO CAU 4.692-2 SALVADOR GNOATO CAU 6.9647-7

CONDICIONADOR DE AR COM CONDENSADOR REMOTO S/ESC. NOTAS:

email: sobe@sobearquitetura.com.br - (41) 3779 7093

OBRA

nos trechos expostos ao tempo com parafusos AA

AUTORES PROJETO

Tubo de cobre 50mm

ALBERTO GATTI NETO HENRIQUE Z. FLEMMING

5468 D CREA-PR 102764 D CREA-PR

ALBERTO GATTI NETO HENRIQUE Z. FLEMMING

Alvenaria ou Laje

1.2 .

S/ESC.

AR CONDICIONADO - CDMI COBERTURA ESCALA

INDICADA

DATA

AGOSTO/2013

5468 D CREA-PR 102764 D CREA-PR
05 HVAC _ CDIM COBERTURA rev02-Layout1

Related documents

05 HVAC _ CDIM COBERTURA rev02-Layout1

1 Pages • 333 Words • PDF • 949.4 KB

PRANCHA 05 - PLANTA TÉRREO SÓTÃO COBERTURA

1 Pages • 2,525 Words • PDF • 3.5 MB

HVAC Systems Commissioning Manual

167 Pages • 53,085 Words • PDF • 6.8 MB

Edited - PRONOME 05/12

4 Pages • 711 Words • PDF • 189.5 KB

Aula 05 - noções direito

38 Pages • 10,080 Words • PDF • 510.9 KB

05 ESTATÍSTICA - POLÍCIA FEDERAL

2 Pages • 352 Words • PDF • 1.2 MB

05 - 2018 1101692

5 Pages • 1,603 Words • PDF • 289 KB

AULA 05 TPOA 2020

16 Pages • 3,039 Words • PDF • 882.4 KB

Info Eduard 2010-05

10 Pages • 2,735 Words • PDF • 18.3 MB

grafica 05 01 21

1 Pages • 205 Words • PDF • 77.6 KB

DWJ 2017-05

148 Pages • 68,368 Words • PDF • 42.7 MB